The biggest
part of your installation that you do not see.
Our pre-installation effort to make sure that there
are no surprises, and that the installation runs
smooth and on time.
From our 7
simple steps for Installation:
1.
Equipment and materials are selected and assembled.
-
Maintaining our equipment and vehicle fleet
'job-ready' at all times.
-
Arranging availability of the required equipment.
-
Arranging for the material to be on hand the day
before shipment
-
Arranging for consumables and tools to be assembled
the day before shipment
-
Arranging the appropriate vehicle and loading the
staged equipment and materials with appropriate
documentation.
2. Job
scheduling is confirmed with you, the customer.
-
Arranging access for the crew, and area availability
for the duration of the installation
-
Arranging power hook-up (where necessary)
-
Arranging transport of equipment and materials
3. Your
crew is scheduled for the site to execute the
installation with ongoing
monitoring by the Applied sales staff responsible for your
job.
-
Arranging a job review with the crew chief prior to
the installation
-
Confirming with the sales staff member the site
arrival of the crew
|