Mobilization
 

 
  The biggest part of your installation that you do not see.  Our pre-installation effort to make sure that there are no surprises, and that the installation runs smooth and on time.

From our 7 simple steps for Installation:

1. Equipment and materials are selected and assembled.

  • Maintaining our equipment and vehicle fleet 'job-ready' at all times.
  • Arranging availability of the required equipment.
  • Arranging for the material to be on hand the day before shipment
  • Arranging for consumables and tools to be assembled the day before shipment
  • Arranging the appropriate vehicle and loading the staged equipment and materials with appropriate documentation.

2. Job scheduling is confirmed with you, the customer.

  • Arranging access for the crew, and area availability for the duration of the installation
  • Arranging power hook-up (where necessary)
  • Arranging transport of equipment and materials

3. Your crew is scheduled for the site to execute the installation with ongoing
    monitoring by the Applied sales staff responsible for your job.

  • Arranging a job review with the crew chief prior to the installation
  • Confirming with the sales staff member the site arrival of the crew